ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
Increasing demand factors in residential
by gfretwell - 03/28/24 12:43 AM
Portable generator question
by Steve Miller - 03/19/24 08:50 PM
Do we need grounding?
by NORCAL - 03/19/24 05:11 PM
240V only in a home and NEC?
by dsk - 03/19/24 06:33 AM
Cordless Tools: The Obvious Question
by renosteinke - 03/14/24 08:05 PM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
0 members (), 255 guests, and 16 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Page 1 of 2 1 2
#159599 01/08/05 07:48 PM
Joined: May 2003
Posts: 2,876
E
e57 Offline OP
Member
Often, if we do not do the total install, we will get the winning bid for Electrical, which will often include some conduit for Tel/Data. So many of them have what I think is a far fetched interpitation of some of the telecom standards of pulling in conduit. i.e. The 2 90 rule... they wont pull in more than 180 degrees of bend, reguardless of fill.

So yesterday the Cablers show up, and I have to tell them the Arch would not allow extra pull boxes in some of the closed walls, and some of them have 3 90's His reply was, "We won't pull it! It damages the cable. And it's code." My reply, "What Code, I challenge you to find one." He only has 3 cat 5e cables in these 3/4" conduits, so I say, "Try some lube." His reply, "Oh, that damages the cable jackets too."

I have an idea where this comes from, an outdated TIA 568 standard (Not a Code) that was a little far fetched, and didn't differentiate fiber optic from copper cabling.

Just wondering if anyone had any thoughts on this?


Mark Heller
"Well - I oughta....." -Jackie Gleason
Stay up to Code with the Latest NEC:


>> 2023 NEC & Related Reference & Exam Prep
2023 NEC & Related Reference & Study Guides

Pass Your Exam the FIRST TIME with the Latest NEC & Exam Prep

>> 2020 NEC & Related Reference & Study Guides
 

#159600 01/08/05 10:15 PM
Joined: Dec 2000
Posts: 4,294
Member
Mark,
I'm not at all familiar with the standards, but can tell you that the 180° "dream world" predates the use of fiber optics.
I can remember hearing about it in '70.

#159601 01/08/05 10:24 PM
Joined: May 2003
Posts: 2,876
E
e57 Offline OP
Member
Here I was thinking it was new.... I was born in '70! [Linked Image]


Mark Heller
"Well - I oughta....." -Jackie Gleason
#159602 01/11/05 12:31 AM
Joined: Apr 2001
Posts: 507
G
Member
I have seen this often in specs. but I've never seen anyone get bent about it.

#159603 01/11/05 04:43 PM
Joined: Dec 2004
Posts: 23
D
Member
well i would rather not have alot of J-Boxes
in my big backbone and interduct pulls
you can always put another wrap on the tugger and use Lots of Lube.
sounds like pure lazyness to me

#159604 01/11/05 10:34 PM
Joined: Apr 2001
Posts: 507
G
Member
I would be interested to hear if anyone has actually ever damaged a cat 5 cable due to excess pull strain and under what conditions that occurred?

#159605 01/11/05 11:07 PM
Joined: Jul 2004
Posts: 625
S
Member
Would you even know if you'd damaged it? You'd probably have to ping it out with a TDR to find out. With the error-recovery mechanisms built into comm protocols, the user likely isn't going to realize what's going on, either--he'll just have slower network performance than he would have had if there was no damage.

#159606 01/12/05 12:40 AM
Joined: May 2003
Posts: 2,876
E
e57 Offline OP
Member
Graphic TDR it would still be realy difficult to tell I think, unless you printed out each pair before you pulled as a refferance. I'm sure someone with too much time on thier hands can cut to length test and install to check it again, like in some testing lab. However I can say that most Certification meters will test exactly the same before and after. (With the same termination.)

With pulling tension of 25lbs max, you could bundle a dozen or so and swing like Tarzan..... Kidding [Linked Image]


Mark Heller
"Well - I oughta....." -Jackie Gleason
#159607 01/12/05 11:24 AM
Joined: Apr 2004
Posts: 349
Member
Here at the large public agency I work for in the Los Angeles area, when we award contracts for the installation of conduit to be used for data lines, we specify no more than 2-90's between openings. Nothing to do with code. Our IT techs who pull in the cabling later (fiber or cat-5) don't care if the openings are pull boxes or condulets, they just want easy pulling. Personally I don't think they have a tugger available, and wouldn't know how to use one (they aren't wiremen).

Radar


There are 10 types of people. Those who know binary, and those who don't.
#159608 01/12/05 12:59 PM
Joined: Dec 2003
Posts: 886
H
Member
Don't think you would want to use a tugger with those cables.

Personally I think the "2 90" requirement is silly. I can't imagine how you could comply in many situations. No reason that you can't upsize the conduit and use a lubricant if necessary. Never heard of a lubricant damaging a cable by the way.

Maybe you need to rethink allowing IT techs with no experience doing this type of work.

-Hal