ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
UL 508A SPACING
by ale348 - 03/29/24 01:09 AM
Increasing demand factors in residential
by tortuga - 03/28/24 05:57 PM
Portable generator question
by Steve Miller - 03/19/24 08:50 PM
Do we need grounding?
by NORCAL - 03/19/24 05:11 PM
240V only in a home and NEC?
by dsk - 03/19/24 06:33 AM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
1 members (ale348), 302 guests, and 14 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
#154066 02/22/04 11:05 PM
Joined: Feb 2004
Posts: 41
R
rknikko Offline OP
Member
Can I move the existing panels from the basement to the ground level public hallway in a 2 family house. I'm doing this because I am moving the existing meters from the basement to the outside of the house? Normally, the panel will be in the tenant's unit, but in this case I am not sure whether it can be installed in the hallway or not. Please help. Thank you.

Stay up to Code with the Latest NEC:


>> 2023 NEC & Related Reference & Exam Prep
2023 NEC & Related Reference & Study Guides

Pass Your Exam the FIRST TIME with the Latest NEC & Exam Prep

>> 2020 NEC & Related Reference & Study Guides
 

Joined: Aug 2003
Posts: 1,374
R
Moderator
I don't see any reason why not. You should be fine. [Linked Image]


Ryan Jackson,
Salt Lake City
Joined: Sep 2001
Posts: 25
D
Member
You may want to check and make shure that this is not a 1 hour rated wall. If it is, you will not be able to mount this panel in the wall. If it isn't rated, then I don't see a problem.

Joined: Feb 2004
Posts: 41
R
rknikko Offline OP
Member
What is a 1 hour rated wall? How can I tell?

Joined: Dec 2003
Posts: 751
E
Member
You can tell because the sheetrock (Gypsum wallboard) will be type X, and usually two layers. Type X has a different shade to it, somewhat darker than non fire rated sheetrock. In a two family, so long as you stay away from the wall that separates the two apartments, you should be OK. If it is, you can still manage by boxing your panels in with a rated partition. Remember to seal all penetrations with rated fire/draft caulk.

Earl


Earl
Joined: May 2002
Posts: 1,716
R
Member
Don't take this the wrong way, but are you permitting this work?

Being that this is a "public" building or atleast not just your residence, you should have this work performed by a licensed electrical contractor.

You did not list your occupation in your profile.

Roger

Joined: Dec 2000
Posts: 4,294
Member
Look at the plans to find rated walls.
Not just at the "E" sheets.
Try the "A" sheets. Very often I've found discrepancies between the "E" and "A" sheets.
BTW, in court, it will be the "A" sheets (reflected ceiling plan) that take precedence...S