ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
Safety at heights?
by gfretwell - 04/23/24 03:03 PM
Old low volt E10 sockets - supplier or alternative
by gfretwell - 04/21/24 11:20 AM
Do we need grounding?
by gfretwell - 04/06/24 08:32 PM
UL 508A SPACING
by tortuga - 03/30/24 07:39 PM
Increasing demand factors in residential
by tortuga - 03/28/24 05:57 PM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
1 members (Scott35), 524 guests, and 19 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Page 2 of 3 1 2 3
Joined: May 2001
Posts: 160
C
Member
I had a AHJ once that said everything was great on final,but would not sign off in the final inspection block on the electrical permit until I put the GFIC protected sticker on the down stream duplex(this was after he tested it to see if was really protected).This was in the kitchen where ther were lots of GFICs and LABELED protected duplexes.
Chris

Joined: Mar 2002
Posts: 360
T
Member
Is it just me or does that sink look backwards?

Trainwire

Joined: Aug 2001
Posts: 466
Likes: 1
J
Member
Chris,

The countertop should only be about 25" deep. I did not think that the measurement you are asking about would count unless the countertop had an inside corner and continued. I would have started the first one where it is and then measured for the 4'. Am I wrong in my assumption. I have never gotten gigged on this.

Joined: May 2001
Posts: 160
C
Member
Jim M,
It looks close however the code says,for counter tops, outlets shall be installed so that no point along the WALL LINE is more than 24 inches,measured horizontally from a receptacle in that space.
I suppose that this means to me that the GFIC rec should be located no more than 24in from the edge of the counter(along the wall line) and the next one no more than 48in away from the first one.
Chris

Joined: Apr 2002
Posts: 7,382
Likes: 7
Member
Virgil:
Damn nice job. If I read this post earlier?, I would have typed "coping saw, dremel w/abrasive wheel & scribe to fit".

BTW: You have to be the only guy who can start a thread & get mucho replies.
John


John
Joined: Nov 2000
Posts: 2,236
Likes: 1
Member
Chris,

In the houses that I'm given the liberty to lay out the design, I put more than twice as many recepts in a kitchen, and just like you're pointing out, I make darn sure that there are enough and in the right places. In fact, I would use 2 gang boxes and have the circuits alternate.

I'd say just about every room has a spacing violation, but I was obligated to place them where the plans showed in order to line up with the designers furniture layout; bogus, I know.

In this particular situation, I would have ganged a recept with the "Pig" switch (lone one on right) to aid in giving enough receptacles for the area.

Oh, the poor designer guy keeps confusing me with some dude named "Darling". Must've been quite an accident...

[Linked Image]

John, Thanks!

Uh, controversy, it's a talent! [Linked Image]

Or maybe I just ask Q's that anybody's grandma could answer and the rest of you guys stump everybody with your more intelligent Q's?

Just a theory...

[This message has been edited by sparky66wv (edited 10-10-2002).]


-Virgil
Residential/Commercial Inspector
5 Star Inspections
Member IAEI
Joined: May 2001
Posts: 160
C
Member
66,
I think I would let Mr Designer Guy(????) meet the inspector and address him as Mr Darling.
Chris

Joined: Nov 2000
Posts: 2,236
Likes: 1
Member
Chris,

Unfortunately, no AHJ, 'cept for the Service Inspection for the Poco.

Wish there were, I'd be worth twice as much $$$ here...

[Linked Image]


-Virgil
Residential/Commercial Inspector
5 Star Inspections
Member IAEI
Joined: Sep 2002
Posts: 11
N
Member
I have done many rough's in custom homes over the years and this is what I have come up with.
1. Walk through job with home owner,Contractor,and cabinet maker first.
2. Using a benchmark instead of the floor for heights is a must.(this assures perfect heights).
3. If it is a definite location then mount a box,leave slack everywhere posible.If your unsure then float the wire,leave pleanty of slack for relocation and draw an asbuilt for reference after sheetrock goes up.
4. do a walkthru just before sheetrock goes up(again).
5. make any final adjustments.
6. If your still off, then CHARGE-CHARGE-CHARGE...$$$

Joined: Dec 2000
Posts: 218
S
Member
66, I agree on the basic color idea, could be why my daughter and wife will not let me match clothes for special occasions. I am also surprised no one mentioned my 2 favorite tools to fix this, sawzall and roto-zip! P.S. The rest of the job looks good.

[This message has been edited by spkjpr (edited 10-10-2002).]

Page 2 of 3 1 2 3

Link Copied to Clipboard
Powered by UBB.threads™ PHP Forum Software 7.7.5