ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
UL 508A SPACING
by ale348 - 03/29/24 01:09 AM
Increasing demand factors in residential
by tortuga - 03/28/24 05:57 PM
Portable generator question
by Steve Miller - 03/19/24 08:50 PM
Do we need grounding?
by NORCAL - 03/19/24 05:11 PM
240V only in a home and NEC?
by dsk - 03/19/24 06:33 AM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
1 members (ale348), 302 guests, and 14 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
#149856 05/01/04 11:21 AM
Joined: Apr 2004
Posts: 156
R
rad74ss Offline OP
Member
I was going through the code violation section and the comments on abandoned wiring and thought I would relate the story of a refit job I worked on.

Several years ago a company I worked for moved to a 'new' plant. It was an old automotive plant that had been abandoned since the previous company moved to Mexico.

Before the Electricians for the company arrived a crew had been sent to move in and place the heavy equipment. The first thing they did was turn on every breaker they could find. This would have been fine except for the fact that when the previous company moved they disconnected the wires from their equipment and proceded to wrap the wires, complete with exposed leads, around whatever pipes or structural members were around.

Several breakers blew completely out of the panels, prompting the movers to call the electricians. Who'd have thunk it?

At this time the company did not want to pay overtime so the electricians were told to wait till Monday and the movers were told to turn off everything. That weekend one of the pipers decided to get a head start on the new compressed air lines. After turning on all the breakers he grabbed a pre-existing air line that had 277 volt wires wrapped around it twenty yards away.

His hospital bill would have covered the overtime.

Subsequently the Electricians began a four month process of tracing down over 1500 circuits whose wire numbers, due to grime from plastics processing, were no longer legible. The circuits had also been ran in all red wire. 120 included. We took down several hundred feet of busbar with missing doors or exposed ends, and replaced lighting in the lower floor of the mezanine. This was due to the bathroom sewage pipes on the top floor leaking into the flourescent lighting below. We began by drilling holes in the plastic lens cover to drain the water that had pulled there.

Eventually we removed twenty-seven tons of unused busbar, wiring, conduit, and piping. We replaced the existing wiring with new clearly marked wiring and labeled every recepticle, and device with the breaker location.

In the end, after selling the scrap, we actually made money on the effort and made the factory a much safer place for us and any future users.

Robert

Arc Flash PPE Clothing, LOTO & Insulated Tools
#149857 05/01/04 01:40 PM
Joined: Mar 2004
Posts: 39
E
Member
Some owners always try and cut corners and usually end up costing themselves a small fortune, disgraceful to think that the previous owners had left the wiring tied around pipework/steelwork etc

#149858 05/08/04 07:14 AM
Joined: Jul 2002
Posts: 8,443
Likes: 3
Member
Robert,
Welcome to ECN, mate!. [Linked Image]
And what an intro with a story like that.
Factory refits are my own personal Nightmare.
I can relate to what you say though, the people that are leaving can't get out of the place quick enough.
And the people moving in, have to be in there yesterday!.
It's unreal!. [Linked Image]