ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
UL 508A SPACING
by ale348 - 03/29/24 01:09 AM
Increasing demand factors in residential
by tortuga - 03/28/24 05:57 PM
Portable generator question
by Steve Miller - 03/19/24 08:50 PM
Do we need grounding?
by NORCAL - 03/19/24 05:11 PM
240V only in a home and NEC?
by dsk - 03/19/24 06:33 AM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
1 members (ale348), 302 guests, and 14 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Page 1 of 2 1 2
#13695 09/10/02 12:41 AM
Joined: Jan 2002
Posts: 122
W
wirewiz Offline OP
Member
Had a call the other day a guy says " I want to know how much it would cost to install a new receptacle, replace my thermostat with a digital/programable type and replace a switch with a time clock switch"
So, I went out gave him an estimate and the total was $255.00

The plug was installed off of an existing switch 2' above, I pulled out a switch and replaced it with a time clock switch and replaced a thermostat.

It took all of 35 minutes and $90.00 in material. What would you charge? The guy was so happy when I left I kind of thought maybe I was too cheap! But everything was so easy and close together. Maybe he was just another satisfied customer! [Linked Image]
Wirewiz

#13696 09/10/02 01:13 AM
Joined: Nov 2000
Posts: 2,236
Likes: 1
Member
Hey, some days you get the bear, some days the bear gets you...

Hope it was delicious!

(Kinda like greasy and stringy beef, actually...)


-Virgil
Residential/Commercial Inspector
5 Star Inspections
Member IAEI
#13697 09/10/02 03:13 AM
Joined: Aug 2002
Posts: 36
T
TE Offline
Member
"It took all of 35 minutes and $90.00 in material."

It took more than 35 minutes.
You had time on the phone.
The trip out to give the estimate.
Gas for two trips. Wear & Tear on your truck.
Pro-rated- The cost of your tools. The time spent putting gas in your truck. Phone bill.
Insurance. Office supplies. Giving quotes for jobs you didn't get, etc etc etc
And don't forget Uncle Sam.

I wouldn't say it was too much or too little.
It all depends on your situation. If you haven't determined your total cost of operating you may not know if it is too little until it's too late.

I gave up on the psychology aspect of pricing
long ago. It seems every time I was actually trying to give someone a good deal they thought I was ripping them off, but If I pushed the limits on pricing I was their Hero.
Go figure.
Go figure.

#13698 09/10/02 06:34 AM
Joined: Mar 2001
Posts: 2,056
R
Member
I also struggle with charging full price for the "slam dunks". I usually discount the surprisingly easy jobs. The problem is, you usually can't up the prices if you run into problems. So, relax and enjoy the extra profit(take the kids to lunch). Next time you have to "eat" an hour or two labor, you'll be glad you did.

#13699 09/10/02 07:23 AM
Joined: Sep 2002
Posts: 131
T
Member
After being burned so many times by contractors and homeowners I charge full price for everthing. No discounts...
Right now I am owed roughly $18,000 in extras done for contractors. The homeowners are disputing these extras and refuse to pay. I am getting very tired of this...

#13700 09/10/02 09:26 AM
Joined: Mar 2002
Posts: 31
S
Member
Next time get the extras on paper with their signature or it won't get done. Then they can't argue.

#13701 09/10/02 10:17 AM
Joined: Jan 2002
Posts: 122
W
wirewiz Offline OP
Member
TE,
"I gave up on the psychology aspect of pricing"

What do you mean?


I understand that there were 2 trips gas, tools, jobs not won, "overhead", blah blah blah.
All I am looking for was a little comparison on pricing. I really thought for what I did and what the customer received I could have charged more and the customer would have still been happy.
Wirewiz

#13702 09/10/02 09:55 PM
Joined: Apr 2002
Posts: 914
E
Member
Don't you just hate it when you give a customer the bill and they say ..."Is that all, man I expected it to be twice that much"... As it turns out those customers are the easiest to please and a pleasure to work for and the guy that about has a heart attack over a $100 bill when you just spent 2 hours in his attic on the hottest day of the year, well he wouldn't be happy if you gave it to him.

#13703 09/10/02 10:08 PM
Joined: Dec 2000
Posts: 4,294
Member
How about $255?
He'll tell all his friends that you're good, and fair. And you can help them, too...Scott

#13704 09/10/02 10:43 PM
Joined: Jan 2002
Posts: 122
W
wirewiz Offline OP
Member
Electure, that's what I am planing on, he did ask for a couple of extra cards.
Wirewiz

Page 1 of 2 1 2

Link Copied to Clipboard
Powered by UBB.threads™ PHP Forum Software 7.7.5