Eek! and I am no one to 'eek' at everything.
I take it there are no inspections in this area?
Bob Badger Construction & Maintenance Electrician Massachusetts
|
|
|
|
Joined: Feb 2005
Posts: 361
Member
|
~~ CELTIC ~~ ...-= NJ =-...
|
|
|
|
Joined: Jan 2003
Posts: 4,391
Moderator
|
What do we have, about 25' - 30' of service conductors in the house?
I wonder how the cable reception is with the coax wrapped up in the NM?
Bob Badger Construction & Maintenance Electrician Massachusetts
|
|
|
|
Joined: Nov 2005
Posts: 187
Member
|
4-gang with bundles of wires, switches not grounded. No outlet on counter. Romex in plumbers pvc. 25' of unfused cable hanging on plumbers strapping. A mess inside and out of panel. Central vac flopping in the return and the 90 not connected. No staples, meter sockets not level. I don't know what you guy's want, it works don't it. And yes there was a rough and finish inspection.
Hank
|
|
|
|
Joined: Jul 2002
Posts: 8,443 Likes: 3
Member
|
Oh my God!. I take it there are no inspections in this area? You'd sort of hope that was the case Bob, I mean, what sort of an Inspector would pass this rubbish??. I can't see any redeeming features at all about this work, it needs the biggest Red Tag in the land. That panel looks to be way overloaded.
|
|
|
|
Joined: Oct 2004
Posts: 806
Member
|
Pic eight is a prime example of why, in another thread, I had mentioned I don't care for wirenuts in a panel. What an incredible mess!! Someone can make a lot of money (maybe) trying to fix this!!
Stupid should be painful.
|
|
|
|
Joined: Mar 2005
Posts: 1,803
Member
|
Pic 9 is most frightening! Take look at those Engineered Lumber joists. Some gormless fool has drilled through the OSB webs right by the flanges, and even put in some extra holes for future requirements!!!!
I'd get me to a lawyer.
Alan
[This message has been edited by electure (edited 04-10-2006).]
Wood work but can't!
|
|
|
|
Joined: Jan 2003
Posts: 4,391
Moderator
|
Pic eight is a prime example of why, in another thread, I had mentioned I don't care for wirenuts in a panel. I actually thought of you when I saw that pic. I thought to myself MX ain't gonna like this. Personally I have no problem with a wire nut or two in a panel when there is a reason. Here we have what appears to be fairly recent work and an attempt to fit as many wire nuts as possible.
Bob Badger Construction & Maintenance Electrician Massachusetts
|
|
|
Posts: 46
Joined: March 2013
|
|
|
|