ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
Increasing demand factors in residential
by gfretwell - 03/28/24 12:43 AM
Portable generator question
by Steve Miller - 03/19/24 08:50 PM
Do we need grounding?
by NORCAL - 03/19/24 05:11 PM
240V only in a home and NEC?
by dsk - 03/19/24 06:33 AM
Cordless Tools: The Obvious Question
by renosteinke - 03/14/24 08:05 PM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
0 members (), 255 guests, and 16 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Page 1 of 2 1 2
#1221 05/01/01 09:21 PM
Joined: Oct 2000
Posts: 5,392
S
sparky Offline OP
Member
Some wire for designated room(s) circuits , some don't. No code to say you must (other than AFCI now)

pro's?
con's? [Linked Image]

#1222 05/01/01 09:51 PM
Joined: Nov 2000
Posts: 2,236
Likes: 1
Member
Rule of thumb:

I split rooms up by recept circuits. Might double up small rooms.
Put lighting on it's own so Mrs. Homeowner doesn't get caught in the dark if the sweeper and/or other device trips the breaker...

No more than 10 fixtures per 15A lighting circuit. 13 Recepts on 20A.

I don't use #14 wire, so in a pinch I'll put lighting on a 20A if 11 through 13 fixtures are more convenient in a given situation.

Any upgrades to AFCI in the houses I have wired would be a piece of cake.


-Virgil
Residential/Commercial Inspector
5 Star Inspections
Member IAEI
#1223 05/01/01 10:25 PM
Joined: Oct 2000
Posts: 4,116
Likes: 4
Member
Sparky,

I usually like to have more than 1 circuit represented in each room. Not dedicated, but so that all in a room are not on same circuit. Maybe follow outside walls on 1 and inside walls on another.

If I can sell it I'll even sometimes run 'Generator Circuits' throughout house to pick up necessary lighting (Hallway, Bathroom, Basement) and a light and receptacle in each room. This can usually be done with 2 or 3 circuits plus Furnace, Refrig, and Well pump (if exists) for a total of 5 - 6. This gives nice coverage around House and it can be run on a 5k Generator.

[Linked Image]
Bill


Bill
#1224 05/02/01 06:07 AM
Joined: Oct 2000
Posts: 5,392
S
sparky Offline OP
Member
Guys;
i'd pretty much would have to say 'ditto' to your posts here,i do the same.... just fishin'for ideas.....
[Linked Image]

#1225 05/02/01 06:55 AM
Joined: Mar 2001
Posts: 2,056
R
Member
Sparky66,

I've seen a few posts regarding not using #14.
In a residentail job, I would think that it would increase costs significantly due to the additional planning and materials associated with box fill issues. Thoughts?

#1226 05/02/01 07:36 AM
Joined: Oct 2000
Posts: 5,392
S
sparky Offline OP
Member
box fill & identification are my two reasons for #14, gotta run more of it, but it works easier, and i know which wires are power vs. lighting.
(back to Bill's generator thing....)

still , there's much poo-poo for #14 out there, dunno rationale?, what say you?
[Linked Image]

#1227 05/02/01 07:37 AM
Joined: Dec 2000
Posts: 4,294
Member
I've pretty much used 12 for residential apps also. Seems it was easier w/ the 20A circs, as I could cover more space w/ less circuits.(used to do some big houses). If you plan it to use the uncrowded (ie. smoke detector) boxes for your junction points, there's really not much prob w/ box fill. Circuits? Bill's got the ticket here. The Gen Circs are a great idea.

#1228 05/02/01 08:16 AM
Joined: Oct 2000
Posts: 4,116
Likes: 4
Member
I've done #12 throughout Houses and as a standard I'm not convinced that it's better overall. I would agree that it would be better for feeders to lessen Voltage drop and larger incidental loads. But as far as connection to the devices goes I'm not sure it should be used with standard-grade wiring devices. It sometimes seems that terminal screws cannot be tightened sufficiently to securely hold the wire. They sometimes get stripped out or come loose when the devices are pushed back into the box.

Real World:
From a job pricing standpoint #12 costs more, needs larger boxes or special routing to avoid it (more wire) takes more time wiring devices and folding into boxes and may need spec grade devices. It's certainly an option that could be offered to the builder/owner, but if you went with this as your standard and were competing for price against others using #14 you'd be starving.

That's just the way it is. If they change the code minimum to #12 then everyone's at 'apples to apples'

[Linked Image]
Bill


Bill
#1229 05/02/01 09:13 AM
Joined: Nov 2000
Posts: 2,236
Likes: 1
Member
Bill,
What brand of devices do you use? I've never had a problem with #12 in Leviton or Eagle brand switches and recepts (15A).

Lighting I use a J box or two in the attic. The HR is to the J Box, and the Feeders "spider" out to each Sw box. The only thing in the Sw boxes are the feeder and the switched leg, or just a switch loop.

As far as #14... I've seen way too many old #14 wires in very poor shape. Corroded green on 1/3 of it's diameter, and very brittle from heat. I've seen #12 in the same location (and presumably, the same age) that was in convincingly better shape.

Warranties may only last a year, but I like my work to last a little longer than that.


-Virgil
Residential/Commercial Inspector
5 Star Inspections
Member IAEI
#1230 05/02/01 10:35 PM
Joined: Nov 2000
Posts: 2,236
Likes: 1
Member
Quote
Bill said:
I usually like to have more than 1 circuit represented in each room...

Makes it a little difficult marking circuits in the panel, doesn't it?


-Virgil
Residential/Commercial Inspector