ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
Do we need grounding?
by gfretwell - 04/06/24 08:32 PM
UL 508A SPACING
by tortuga - 03/30/24 07:39 PM
Increasing demand factors in residential
by tortuga - 03/28/24 05:57 PM
Portable generator question
by Steve Miller - 03/19/24 08:50 PM
240V only in a home and NEC?
by dsk - 03/19/24 06:33 AM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
0 members (), 220 guests, and 12 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
#121726 08/15/05 04:58 PM
Joined: Oct 2000
Posts: 3,682
Likes: 3
Admin Offline OP
Administrator
Member
Quote
I was asked by my customer to check out the electrical systems in this newly purchased home he paid $11 + Million Dollars, here in California, in SF Bay Area. I opened this main gate access control panel and this is what I found, nothing was labeled. I've been an electrician for 47 years and nothing surprises me anymore!

Norm
[Linked Image]

#121727 08/15/05 08:02 PM
Joined: May 2005
Posts: 178
J
Member
Are you kidding? That's CLEAN compared to what I found in my gated community! At least everything there is mounted on a board, more-or-less.

Our stuff was just piled into the bottom of the motor cabinets. Loop detectors, relays, transformers, everything embedded in a big fur-ball of wires and wirenuts, lying on the ground. I wish I'd taken pictures before I cleaned it all up.

That is an amazingly complicated panel for a residential gate, though...

#121728 08/15/05 10:01 PM
Joined: May 2003
Posts: 2,876
E
e57 Offline
Member
Looks familiar, there's alot of hodge-podged gate stuff here. Too many C-13 "Gate Guys" doing C-10, and access/security work.


Mark Heller
"Well - I oughta....." -Jackie Gleason
#121729 08/16/05 01:57 AM
Joined: Oct 2004
Posts: 806
Member
Loads of crap in there for sure. Looks like the gardners got their LV lighting trans/timer in there (black box mid right) too.

That CL 2 transformer on the bottom left can be counted on to flame out soon too. (I used to see the same doing CCTV work.) Note the discoloration.

edited for spellin's

[This message has been edited by mxslick (edited 08-16-2005).]


Stupid should be painful.
#121730 08/16/05 03:25 AM
Joined: Jul 2002
Posts: 8,443
Likes: 3
Member
Norm,
Good call there mate.
Good Lord is this rough or what??!.
I hope that this Enclosure was padlocked shut?.
Considering the live bare terminals in the mid-bottom part of the enclosure. [Linked Image]
What a mess.

#121731 08/16/05 10:47 AM
Joined: Jan 2005
Posts: 155
D
Member
Years ago I had to add some pneumatic solenoids to for a guard and hold downs with time delays of a large panel saw with a 20" blade in a cabinet shop.
After trying unsuccessfully to interface all of the new components into the existing control circuit I found that the control wiring had been changed form the original schematic. It was simpler to rip all of the wiring and rewire the panel by wiring in each limit switch, each relay, contactor, etc, and then adding the modifications.
Sometimes trying to figure out the mess takes more time than it would take to start from scratch and rewire the whole thing.

#121732 08/18/05 07:44 AM
Joined: Dec 2004
Posts: 161
G
Member
I like the loose stripped red just below centre of picture.


Link Copied to Clipboard
Powered by UBB.threads™ PHP Forum Software 7.7.5