Does anyone else come across situations like the following? It seems that I can't drive down the street without seeing Meterpans and SE Cables dangling off the side of a House while it gets sided or remodeled. Is this common in your area? Has anyone heard of any Fires or Injuries that were caused by something like this? Bill
|
|
|
|
Joined: Oct 2000
Posts: 4,116 Likes: 4
Member
|
Another Example: Anybody else see stuff like this? Bill
Bill
|
|
|
|
Joined: Nov 2002
Posts: 558
Member
|
Sadly,I think this is a problem all over Bill. And the sparky is the bad guy because he has to fix this mess."The siding guy said it shouldn't cost near that much". Russell
|
|
|
|
Joined: Jun 2001
Posts: 642
Member
|
Just tell the home owner to deduct your fee for fixing this willful damage from the siders bill. If the local AHJ's would find a way to cite the fly by nite siders who do this type of work maybe this would be stopped. Of course it would take fines and jail time to get the message across. Do the local laws give that tool to the AHJ's?
ed
|
|
|
|
Joined: Nov 2002
Posts: 558
Member
|
I would say this would come under"unlicensed electrical work" and they could be cited for that.
|
|
|
|
Joined: Oct 2000
Posts: 4,116 Likes: 4
Member
|
I don't know the situation for the first set of photos, but in the second set the condition was the result of a second floor addition going up.
This is really the extreme of what I see and not just a result of siding being done. Does anyone remove the service to a pole as a regular course of action during major remodels, or is it generally left hanging somehow? I've only been asked once to move a service to a pole and that's because the whole house was being torn down.
It seems like the Contractors generally feel comfortable with leaving a service in this condition until they're finished with what they are doing and ready to call an Electrician in. I was just wondering if anyone knew of any Horror stories that resulted from something like this.
Bill
Bill
|
|
|
|
Joined: Dec 2001
Posts: 2,498
Member
|
Ouch, that's a bad one! BTW, shouldn't the chimney extend beyond the roof?
|
|
|
|
Joined: Oct 2000
Posts: 4,116 Likes: 4
Member
|
T_R,
Yes, the chimney did extend above the roof at one time. This was a one floor House originally and they added a second floor. The chimney was extended later on.
Bill
Bill
|
|
|
|
Joined: Feb 2003
Posts: 67
Member
|
pitiful! i would not leave that site until the poco disconnected those services.accidents waiting to happen.
|
|
|
|
Joined: Apr 2002
Posts: 7,381 Likes: 7
Member
|
Bill: In the humble opinion of an AHJ and Contractor.. FRom the AHJ standpoint: Photo 1,2,3& 4 all create an "unsafe" condition, I could issue a violation sticker at site, proceed to the office and write a "written violation notice" indicating a $500.00 per day fine, and a notice of shut-off, unless repairs are promptly initiated with a permit. 99% of the time, the repairs are made very promptly.
From the contractor side: In this area, the people creating these situations are siders, or carpenters/builders. Unfortunatly, they are not licensed in NJ,but some towns require them to "register". The "bad" ones give the whole trade a bad name. I guess it generates some work for the EC's, but it sure creates a dangerous condition. John