ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
Do we need grounding?
by gfretwell - 04/06/24 08:32 PM
UL 508A SPACING
by tortuga - 03/30/24 07:39 PM
Increasing demand factors in residential
by tortuga - 03/28/24 05:57 PM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
1 members (Scott35), 384 guests, and 12 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
#112415 06/16/01 09:33 PM
Joined: Oct 2000
Posts: 3,682
Likes: 3
Admin Offline OP
Administrator
Member
[Linked Image]
Quote
Checking all the aluminum terminations in the complex, as there was a burnout in one of the units. To get to this loadcenter, I had to move:

1. A pile of rags on top of

2. 2 - nearly full 5 gallon buckets of printers ink, both without lids (red flammable labels). next to

3. An electric heater, still plugged in even though it's 95ยบ.

4. 2 boxes, 1 containing copies of the NEC, the other full of Cal-Osha Safety Manuals.
Fortunately the aluminum was OK, and the landlord requires fire insurance.

Electure

#112416 06/19/01 06:23 AM
Joined: Oct 2000
Posts: 5,392
S
Member
Electure;
this must be the #1 violation of the NEC, in particular because one does not need any tools.

maybe you should cut out 110-26 and paste it on the panel door????

[Linked Image]


Link Copied to Clipboard
Powered by UBB.threads™ PHP Forum Software 7.7.5