How would you have done it?
A) I would have used the POCO specified meter can with the hub on the top, not on the bottom.
B) For where the service head is in the picture, service entrance cable would be the most practical installation IMO.
C) The best installation IMO would be up out of the top of the meter can with RNC, 90ยบ sweep to the left, 10' run to a pulling LL, then through the roof, install mast kit.