ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
Do we need grounding?
by gfretwell - 04/06/24 08:32 PM
UL 508A SPACING
by tortuga - 03/30/24 07:39 PM
Increasing demand factors in residential
by tortuga - 03/28/24 05:57 PM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
1 members (Scott35), 403 guests, and 13 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
#110665 05/31/06 09:51 PM
Joined: Dec 2000
Posts: 4,294
Member
From Lone Gunman

Quote
The romex going into the bottom of the genny panel on the left was backfeeding the whole main panel. The two pole 50 on the left of the main panel thats right under the 2 pole 100 was the backfed breaker.


[Linked Image]


[Linked Image]


[Linked Image]


[Linked Image]

Stay up to Code with the Latest NEC:


>> 2023 NEC & Related Reference & Exam Prep
2023 NEC & Related Reference & Study Guides

Pass Your Exam the FIRST TIME with the Latest NEC & Exam Prep

>> 2020 NEC & Related Reference & Study Guides
 

#110666 05/31/06 11:29 PM
Joined: Feb 2005
Posts: 693
L
Member
Oh, turn THAT off. Now I get it.


Larry Fine
Fine Electric Co.
fineelectricco.com
#110667 06/01/06 02:58 AM
Joined: Jul 2002
Posts: 8,443
Likes: 3
Member
Note to idiots:
Keep Duct Tape by your Electrical gear, good for them impromptu joints.
[Linked Image]

[This message has been edited by Trumpy (edited 06-01-2006).]

#110668 06/02/06 07:26 PM
Joined: Jan 2005
Posts: 22
X
Member
Nice, I deal with alot of Generators, and I have one we work on that has that exact transfer switch.....As for the backfeads, what was the purpose of this.....i'm not getting your post

#110669 07/15/06 11:39 PM
Joined: Oct 2004
Posts: 806
Member
In the second pic, what are the two red wires, which are lugged to the busbars, and the fuseholders(?) on the lower right of the pic for?


Stupid should be painful.
#110670 07/16/06 02:39 PM
Joined: Jul 2006
Posts: 272
L
Member
Gotta love that duct tape! [Linked Image]


Luke Clarke
Electrical Planner for TVA.

#110671 07/16/06 07:18 PM
Joined: Mar 2001
Posts: 345
T
Member
So let me get the sequence of operations clear in my mind.
Power fails
Transfer switch transfers the supply that goes from the one hundred ampere breaker in the larger panel to the left hand emergency panel over to the generator.
Some bozo comes along and opens both the large panels main breaker and the one hundred ampere breaker that supplies the transfer switch and then closes a back fed fifty ampere breaker in the main panel thus energizing loads in the main panel through the ? gage wire in the Romex.
That's very clever in that NOT sort of way.
--
Tom Horne


Tom Horne

"This alternating current stuff is just a fad. It is much too dangerous for general use" Thomas Alva Edison