ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
Increasing demand factors in residential
by gfretwell - 03/28/24 12:43 AM
Portable generator question
by Steve Miller - 03/19/24 08:50 PM
Do we need grounding?
by NORCAL - 03/19/24 05:11 PM
240V only in a home and NEC?
by dsk - 03/19/24 06:33 AM
Cordless Tools: The Obvious Question
by renosteinke - 03/14/24 08:05 PM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
0 members (), 255 guests, and 16 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Joined: Jul 2002
Posts: 8,443
Likes: 3
Trumpy Offline OP
Member
Quote

No inspections here apart from the Septic.
XXXXXX County, Arkansas.
Pics submitted by NORCAL!.

[Linked Image]

[Linked Image]

Care to comment NORCAL?.
It's all yours.

Stay up to Code with the Latest NEC:


>> 2023 NEC & Related Reference & Exam Prep
2023 NEC & Related Reference & Study Guides

Pass Your Exam the FIRST TIME with the Latest NEC & Exam Prep

>> 2020 NEC & Related Reference & Study Guides
 

Joined: Sep 2002
Posts: 943
Likes: 2
N
Member
The good news it was disconnected a couple of weeks ago.

Corrected spelling error.

[This message has been edited by NORCAL (edited 11-09-2004).]

Joined: Dec 2000
Posts: 4,294
Member
Is this a temporary service for construction power?

Joined: Sep 2002
Posts: 943
Likes: 2
N
Member
It was.

A
Anonymous
Unregistered
Glad it was disconnected! Just drives me crazy when duplexes are installed upside down! hehehe

Joined: Dec 2000
Posts: 4,294
Member
It looks like all new material, so this hasn't been place-to-place.So,,,
Why run it all the way up the pole, just to run it back down again?

[Linked Image]


(We usually have the twistlocks on the pole, and guys with adapters for their u-ground cords, not the other way around)

Joined: Sep 2002
Posts: 943
Likes: 2
N
Member
Its a long story but part of it is that is the way the electric co-op wanted it,they only wanted their cable in the transformer,it was set up w/LBs going into it before the UG/OH "hybrid".

PS I did not do it! It is what I was told about it,also it does not show but the floating 4 square is fed w/ romex,no GFCI protection.


Link Copied to Clipboard
Powered by UBB.threads™ PHP Forum Software 7.7.5