Al,
Sorry, but the required accessible grounding point is not in the pictures that were posted, so how would anyone reading this thread be expected to know that an accessible point was available? As I told, Bob in an earlier post, that would not be the normal installation method here. The utility requires that the PVC for the GEC terminate below grade.
Don


Don(resqcapt19)