ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
Increasing demand factors in residential
by gfretwell - 03/28/24 12:43 AM
Portable generator question
by Steve Miller - 03/19/24 08:50 PM
Do we need grounding?
by NORCAL - 03/19/24 05:11 PM
240V only in a home and NEC?
by dsk - 03/19/24 06:33 AM
Cordless Tools: The Obvious Question
by renosteinke - 03/14/24 08:05 PM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
1 members (CoolWill), 250 guests, and 13 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Joined: Oct 2000
Posts: 2,749
Member
Quote
WARNING $1000 FINE UNSAFE INSTALLATIONS

In line with ORS 479.710, which states, “Electrical installations must meet
minimum safety standards. (1) Except as provided in ORS 479.540, no person
shall make, supervise or direct the making of an electrical installation which does
not meet minimum safety standards.” As stated by John Powell, Chief Electrical
Inspector for the State of Oregon, at the last industry meeting held September 14,
2004, unsafe installations would include connecting all breakers to the circuit
conductors without a device on the end of the circuit. Any circuit that is
energized or could be energized by turning on switches or breakers are
considered unsafe and are subject to $1000 fine and suspension of license to the
company/installer/inspector.
At this time, the City of Bend will approve with
exception any such installations. The responsibility of making any installation
safe is up to you. But as of October 1, 2004, such types of installations will be
denied.
Thank you, Lukas L. Koomen, Chief Electrical Inspector
Reminders:
• Conduit straps not approved to support SE cable.
• Two gang nail on boxes not approved for range cable.
• Approved fittings required for 8/3, 6/3 cables for panel and boxes.

City of Bend
Community Development Department
Building Division
Bend, OR 97701


[This message has been edited by Joe Tedesco (edited 09-15-2005).]


Joe Tedesco, NEC Consultant
Stay up to Code with the Latest NEC:


>> 2023 NEC & Related Reference & Exam Prep
2023 NEC & Related Reference & Study Guides

Pass Your Exam the FIRST TIME with the Latest NEC & Exam Prep

>> 2020 NEC & Related Reference & Study Guides
 

Joined: Jun 2005
Posts: 821
S
Member
I used to put everything under a breaker and then tape them off until I returned to do the trim out. The new company I work for has a different policy and I think its better than the old one. Now when we tie in the circuits we put the breakers in but NEVER put them under the terminal until everything is in. Now I prefer this policy. My tool supplier, though, hates this policy because I dont "blow up" as many linemens pliers as I used to!

Joined: Dec 2004
Posts: 329
I
Member
"My tool supplier, though, hates this policy because I dont "blow up" as many linemens pliers as I used to!"

LOL Yeah, I think we all have a pair with a mysterious notch in the cutting surface!
[Linked Image]

Joined: Apr 2005
Posts: 73
D
Member
Isn't that how you get wire strippers?


Link Copied to Clipboard