Inspection request here, please discuss!
Joe Tedesco, NEC Consultant
|
|
|
|
Joined: Jun 2003
Posts: 1,143
Member
|
What's with the coiled cable behind the tank?
What's in the j-box on the wall behind the tank?
What's the raceway for that's next to the j-box?
Do those runs of flex have an equipment grounding conductor installed and properly terminated?
|
|
|
|
Joined: Feb 2002
Posts: 2,233
Member
|
I see no disconnect for the well pump. Or even a lockable disconnect, plus that looks like a water heater next to the well. Same goes for that. You would need a disconnect for the water heater and depending on which code you are using, a locakable disconnect might be acceptable. What about bonding jumpers across the hot and cold pipes? Is there a cover for that big j-box? How about straps on the EMT pipe. Did Doug or I get what you were looking for?
|
|
|
|
Joined: Oct 2000
Posts: 2,749
OP
Member
|
Yes, and you answered the question.
Joe Tedesco, NEC Consultant
|
|
|
|
Joined: May 2004
Posts: 81
Member
|
Maybe the distribution panel is in sight
|
|
|