ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
Safety at heights?
by gfretwell - 04/23/24 03:03 PM
Old low volt E10 sockets - supplier or alternative
by gfretwell - 04/21/24 11:20 AM
Do we need grounding?
by gfretwell - 04/06/24 08:32 PM
UL 508A SPACING
by tortuga - 03/30/24 07:39 PM
Increasing demand factors in residential
by tortuga - 03/28/24 05:57 PM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
1 members (Scott35), 235 guests, and 27 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Page 2 of 3 1 2 3
Joined: Nov 2002
Posts: 456
C
Member
If you look closely, the bottom "white" wire,
it appears to have been red at one time.

Stay up to Code with the Latest NEC:


>> 2023 NEC & Related Reference & Exam Prep
2023 NEC & Related Reference & Study Guides

Pass Your Exam the FIRST TIME with the Latest NEC & Exam Prep

>> 2020 NEC & Related Reference & Study Guides
 

Joined: Nov 2000
Posts: 2,148
R
Member
352.10 (H) Support of Conduit Bodies. Rigid nonmetallic conduit shall be permitted to support nonmetallic conduit bodies not larger than the largest trade size of an entering raceway. The conduit bodies shall not contain devices or support luminaires (fixtures) or other equipment.
352.12 Uses Not Permitted.
RNC shall not be used in the following locations.
(A) Hazardous (Classified) Locations.
(1) In hazardous (classified) locations, except as permitted in 503.3(A), 504.20, 514.8, and 515.8
(2) In Class I, Division 2 locations, except as permitted in 501.4(B), Exception
(B) Support of Luminaires (Fixtures). For the support of luminaires (fixtures) or other equipment not described in 352.10(H).(C) Physical Damage. Where subject to physical damage unless identified for such use.


Don(resqcapt19)
Joined: Apr 2001
Posts: 518
J
Member
As with many of these photos, the primary problem seems to be the LOCATION of the work.

Perhaps the NEC needs to be a little more specific as to the expectation that things will be placed where they are not subject to mechanical damage, corrosion, etc. We need to be able to consider such things as lawn sprinklers, backing-up trucks, etc.
We also need to stress the accessibility of controls- not only to the operator, but locating them so that their use is apparent and the operator can monitor his efforts.

Joined: Dec 2003
Posts: 524
Member
...Now...Ive truly seen everything....that atrocity was still live..??


.."if it ain't fixed,don't break it...call a Licensed Electrician"
Joined: Apr 2004
Posts: 812
Member
This reminds me of when I was rewiring a traffic signal. The person at the factory must of had way too much White, 18AWG, AL wire, not copper-clad, AL. How do I know which is which besides tugging on them and seeing which one pulls in the next section. (Thank goodness the red had a red and res/white stripe wire.)


Is there anyone on board who knows how to fly a plane?
Joined: Oct 2000
Posts: 2,749
Member
Bump!


Joe Tedesco, NEC Consultant
Joined: Apr 2004
Posts: 812
Member
I think I also see a little bit of red on that white wire. Any pics of the device in the box, if there was one?
Ian A.


Is there anyone on board who knows how to fly a plane?
Joined: Jul 2002
Posts: 8,443
Likes: 3
Member
Truth of the matter Joe,
That box should have been fixed to a pillar or the like.
To take the wieght off of the conduits and the wiring. [Linked Image]
I think that maybe the PVC cement may have also been laid a bit thinly too.

[This message has been edited by Trumpy (edited 07-08-2005).]

Joined: Jul 2004
Posts: 625
S
Member
I have many times seen RMC coming out of the ground, supporting a Bell box, which in turn supports a landscaping light fixture. I take it that those installations are all in violation of Code? Or is there a provision somewhere that allows that use?

Joined: Jan 2005
Posts: 5,445
Likes: 3
Cat Servant
Member
Rigid can be used as a support..the issue is whether any install has "enough" support,or is "suitable" for its' location.

The pic shows an install that clearly wasn't adequate, as it was damaged. The challenge is to either have a more robust construction, or to have some sort of barrier to guard it.

It comes down to the "Seven P's":
Proper
Prior
Planning
Prevents
Piss
Poor
Performance

Page 2 of 3 1 2 3