My personal opinion is that using SE is the cheap way of doing it. I prefer doing services in RNC and copper wire. But the contractor I work now can make more money using SE, so SE cable is what we use.

And as far as I'm concerned, the load side from the meter (on residential services) is always subject to damage. If it were up to me, all load sides from the meter would be mandatory conduit.