Hi,
Have you ever seen an overhead SE drop with a EGC or GEC?
The first ocpd has a gec but no egc.
The GEC is ALSO REQUIRED to be established at the detached building or seperate service.
Correct?
-regards
Mustang
[This message has been edited by mustangelectric (edited 11-18-2004).]