Rick,

I have tried that approach. The head inspector says that to do something that is permitted by a later Code is a legal issue. He feels that it would be breaking the law and he will not open himself nor the inspection department up to a legal challenge. As far as he is concerned there is no Code past the 93.

I just tried to wire a hot tub using NM-B from the panel to the DC then PVC to the tub. No go, conduit all the way from the panel. No room to negotiate even though this would have been Code compliant under the 02.

I also believe that the circuit requirements for bathrooms are significantly different.

[This message has been edited by Jim M (edited 05-22-2003).]