Over here in NJ:
"Rough" (Commercial)
Pigtails/boxes installed for lighting
Pigtails/boxes for exit/emerg units
All splices made-up in all device boxes
Grounds spliced, pigtails and bonded to boxes
All cables into panel
All connections made at panel
Some prefer that the circuits remain un-energized until rough, most allow use as "temporary" if GFI's are installed.

We haven't touched residential in a while, but it used to be basically the same.

HotLine1
John


John