According to the electrical contractor,it was a serious violation to mix services,and therefore to get up to code we had to pull circuits out of an area that was provided by say service one and run circuits from service 2 into the location that service 1 had been powering that way all power in that room was from one service and disconnects are all in same area


MAY THE SUN SHINE ON YOUR FACE IN THE MORNING AND YOU AWAKE WITH A SMILE