When they first went to PVC risors for UG around here both PoCos required a 90 deg sweep 24" below grade. When it became obvious that over time the ground settling around the 90 pulled down on the pipe and caused damage, they prohibited the use of the 90 and instead required just a straight pipe at least 24" below grade with a slack loop of conductor where it entered the risor.