I have a ufer subbed out in a residential basement , outside I have added a supplemental grounding rod and run a continuous #6 GEC from the service panel neutral terminal connecting them together.
Also I have bonded the well casing and water pipes continuous with #6 back to the service panel and terminated it on the neutral bar.
Should I have done this different and run the water pipe GEC back to the Ufer??