The running of a new 60A drop to a new Meter Pan seems logical - and was the first design choice.

However, the building owner and PPl want to minimize the amount of equipment on the outside of the building.

The intention is to use an electrical contractor that works in the area, I just like to do a little research on PoCo procedures in certain areas when designing a project.

I am only involved in the design side of the project.