I am wiring a small store front with about 15 cans. I installed them and left the whips hanging at the j box in the dropped ceiling and got my rough so the contractor could close up the ceiling. Job got signed off and today I drive over and see the new lights I installed were working so I go inside and open the ceiling tile to find a new j box made up. The contractor did the connections and turned them on.
How would you guys handle this?