It's a 3-way pilot light with the load at start of run.

The pilot light itself is wired parallel with the load so at the pilot light side there needs to be- 2 travelers + 1 common + 1 neutral. = 4 conductors. What should we pull to that location? It's residential. 12/3 plus one 12/2 and just cap one conductor off?