Shockme:
I'm not to far 'south' of you. THe majority of the solar I have inspected (resi) is connected to backfeed the grid (PSE&G)
State BPU says that the utilities HAVE to buy generated power.

As to the $$$$$, not my thing.

BTW, Middlesex Water Co is now installing 'Phase II'; the second half of a 500KW solar system at the treatment plant. 1/2 is on the roofs(3); the 2nd half is basically 'on the ground', over a buried tank field. There plan is to use all the green power for the plant, not to dump into the grid

John


John