In my defense, the location of the drop was changed.
Had to run 3/4" PVC to two 6x6x4 PVC Boxes and terminate the HR's to the old HR's while suffering with my new found bulging disc...
I had cut the mast 6" too short and had to add a nipple to the bottom after the conductors were installed, then the conductors were too short (by 1/4").
They were charged at the original 8 hour figure...
[This message has been edited by sparky66wv (edited 10-21-2001).]