Hi,
There was a 200A CSED mounted on the pole when I showed up.

It is an underground service that is 125 feet from the house.

I installed a 200A main panel and a 100A sub panel which are almost full.

There is Electric Heat two 60A disconnects, Electric Range 50A, Electric HW 30A, 240V Micro 20A, Dryer 30A, AC 40A, Dishwash 20A ,Disp,ref and tons of lighting and 5 ceiling fans at 60A.

What do I do now? There is no way they will pay to upgrade now.

Am I responsible for this mistake?

-regards

Greg

[This message has been edited by mustangelectric (edited 01-03-2005).]