From an e-mail I received:
Quote
I have a sixteen circuit panel (Pushmatic Electri Center)that has the MAIN located about 1/3 of the way down the box. There are six circuits above it, that stay live when the MAIN is tripped. The ten below the main all go dead. Is there a way to move the MAIN to the top of the panel, and open up these additional circuits, so it's safe?
The main mount to the bar looks to be very unique!?
How was this ever approved in the past, or do you think someone moved it there?
Anything you can tell me about this box would be appreciated!

Bob Stubbs