I have a pole with a meter and a service disconnect attached. There is a Mobile Home fed from there now. Owner is putting in a modular and wants feeder swapped to new home. Breaker is sized OK. Can I run 3 wire URD/USE into the house and run 80ft to the other end drilling the floor joists or conduit? Wouold a ground rod outside the panel location be acceptable?