It is possible that the utility wanted to primary meter, hence the location of the meter.
I've never seen a set of service entrance drawings, local or not, that did not require the electrician to coordinate with the Utility Company, and include all related costs.
Nobody knows the local utility requirements better than the local electricians.


Ron