We are relocating a rework center to our location and I am having trouble on how to wire these things up. In there current location, they are wired with SO cord and a twist lock recpt. mounted into a fiberglass ceiling panel. The old ceiling that is located here could not support the weight of 4 10' 4 conductor so cords hanging from them. There are 50 benches that have to be wired and they have to be able to move 2-3' according to the work they are doing. My first thought was to hang SO from the building, but 400-8 prevents this due to the hole in the suspended ceiling. Hard piping prevents them from moving the benches as needed without me have to disconnect them. Any and all ideas are appreciated.
Thanks
Keith