In my friends house he has K&T in his attic, one the HOT goes to a light and the Neutral goes to Switch. He wants to relocate the switch so it is going to need longer wiring going to it. Is it OK to run the K&T into a Jbox and run romex out to the switch in the new location? Also would it be OK to leave the Neutral as swtiched.