I'm installing a 480/120/240 single phase transformer to feed a 150 amp panel 120/240 in a remote wood building which is a air compressor room no steel to bond to 200' away from the main service. Do I need to run a 3/0 from the building steel of the plant which the main service is grounded to to bond the transformer or is two ground rods all I need.