Reno, I want have enough room to put another conduit inside. There are at least (3) 3/0s , and the neutral (I'm not sure now what they're using). The pipe is being used as the equipment ground. I've got some "flashing" I used on another job. I might can cut me a piece, and roll it up enough to go over the wires and down into the pipe enough to protect it from the cutters once they penetrate. Looks like I'm going to have to sawzall the bottom of the old panel, just to get it out. With pipes on the top and pipes on the bottom, going to be a tight fit. The panel is not going to be used again anyway, buss bar on bottom is "pitted" real bad.

Last edited by sparkync; 10/08/13 11:13 PM.