I'm starting a project next tuesday. Rewiring an old k&t house. It is a 2 story brick, approximately 4k sq ft. Basically changing out existing stuff, not too many upgrades. They are also doing a lot of replumbing and having a completely new hvac system installed. I've never tackled a project this size, or with this much lathe and plaster. It is completely time and materials with a high end estimate.

The attic is open and it is on a full basement. Actually the house is 3 stories with this figured in. What is the best way to take on this thing and do it most efficiently. I did inform the homeowner that some demo would be necessary. A good news is that hopefully I can get in before the hvac guys and won't have to work around their pipes the whole time.