Well i've been lurking here for months and i've decided to air a pet peeve. Lately on all the commercial ti's the framer and drywaller are one and the same. As soon as enough wall goes up to hang a sheet of drywall they do. I have walked into these jobs having to cut all my own boxes and switches in from the backside. Is this common practice across the US? Takes a lot more time than if i could work both sides of the wall.