I am adding a SSAC voltage monitoring relay to an existing 3 Ph. main entrance.
I am concerned with how to tap into the 3 legs and connect to the monitor.
this will be a permanent metering hookup.
I am thinking of using small 1 amp inline fuses on each with 14 Ga. wire. With the fuse as close to each of the taps as possible.
this box is a big fused disconnect.
I am sure that the NEC has something to say about how to do this.
any input is appreciated.