That is a new code rule and yes it says if you do automatic switching the generator must be able to supply the whole transferred load.

If it is manually switched the user can do manual load management. If you think about it, that does make sense.
They do not want a 12kva generator trying to supply a 15 KVA load and only depending on a breaker to save it.


Greg Fretwell