I'm replacing a fluorescent ceiling fixture in a kitchen with at least three recessed fixtures spaced 48" apart. The ceiling joists run perpendicular to the path of the cable. I guess this is a job for a Greenlee Diversabit. The existing box is where the center fixture will be and I have to drill through at least two joists to get to the next fixture. I have not used these long bits. Any tips or comments?