During my time in Kuwait and Afghanistan, I saw some pretty horrible wiring jobs. The power panels came with all the CB blanks taken out. When I got home, I mailed a dozen back to my relief (who was an electrician in Fl.). They were using a 8 ckt panel as a switch. Nothing like walking into a dark container and fumbling around looking for a breaker on a panel cover with six of the remaining spaces open. As bad as some facilities were, I'd always thought that I didn't have to worry about getting killed in the shower (except by a stray mortar). Ignorance was bliss....