One shopping center out here had their painting contractor do that for each pole they were painting at the final trim out before the mall opened.

They had theirs on trailer tires and used the leveling screws at the bottom of each leg take the load off the tires and level it at each pole. You would see 3 painters pushing this rig from pole to pole evey few hours.