For a book that says it is not a design manual it sure seems like it is headed that way. What do you think?

This is copied from the T&B Code change booklet.

Communications Circuits (continued)
120
Article 800
Section 800.156 (NEW) Dwelling Unit Communications Outlet.
For new construction, a minimum of one communications outlet shall be installed within
the dwelling and cabled to the service provider demarcation point.
Analysis of Change:
This new requirement is intended to ensure access to land based (hard-wired)
communications in all dwelling units. Although wireless communications as the principal
means of communicating is on the rise, Code-making panel 16 felt it necessary for safety
in the event of emergency. The panel did not address the need for the owner/occupant to
activate the service through a service contract with the provider in order for the land based
communications outlet to be of use in the event of an emergency.