Tel/data/video for an student apartment building is being provided by the local telco. They are installing several racks in a tel/data distribution room. Each with a ground bar on the rack. I think they want a ground bar in the room to bond each of their bars to.
Any suggestions on the size of the bar?
Then a #8 or #6 back to the service ground?

Last edited by cgw; 08/07/07 08:29 AM.