I went to quote a service Upgrade in a Renovation in an existing Basement suite.
Job was accepted and all the details of what was needed was discussed and proposal signed.
What Happened was their reno contractor was in a rush to insulate the ceiling and he installed recess cans in an area that i was told nothing was needed for electrical. I show up and see 3 cans installed and wired to the existing lighting circuit. He has insulated and put up the vapor barrier. There was no count done on how many outlets are on the circuit. the existing light outlet box was used as a J Box and is only a 1 1/2 deep box and there is 5, 14/2 nm cables entering it..This reno guy is very adamant that this shouldn't of been an issue and I am having a hard time trying to deal with him trying to explain that he isn't allowed to do this. I even showed him a copy of the brochure that the safety branch has out about guys like him and he didn't want to even discuss it.I have taken a permit out on this job.

this guy has to be stopped as this is his career and will continue doing this type of unqualified work.