Basic wording is 'tag at both ends'. It's within most if not all of the LV sections, Phone/data/alarm, etc.

Greg's 'spare' could be debated....both ends should match; ie; apare #1, etc. IF you want to be nit picky.

Basically, cleaning up LV can generate some extra $$ for EC's doing renovation (comm)

When drop ceilings are removed, there's what I call "sins of the past". Unsupported, fished, etc. LV cabling, and the occasional power wiring that more than likely was 'added' after the ceiling inspection(s)

We (NJ) enforce removals (LV), and whatever 'remains' has to be properly supported and identified. "Power wiring' is usually all removed, or re-installed.

Now, before the bullets start flying....I'm talking Comm/Ind work, ceiling areas, not resi.

John