Often, if we do not do the total install, we will get the winning bid for Electrical, which will often include some conduit for Tel/Data. So many of them have what I think is a far fetched interpitation of some of the telecom standards of pulling in conduit. i.e. The 2 90 rule... they wont pull in more than 180 degrees of bend, reguardless of fill.

So yesterday the Cablers show up, and I have to tell them the Arch would not allow extra pull boxes in some of the closed walls, and some of them have 3 90's His reply was, "We won't pull it! It damages the cable. And it's code." My reply, "What Code, I challenge you to find one." He only has 3 cat 5e cables in these 3/4" conduits, so I say, "Try some lube." His reply, "Oh, that damages the cable jackets too."

I have an idea where this comes from, an outdated TIA 568 standard (Not a Code) that was a little far fetched, and didn't differentiate fiber optic from copper cabling.

Just wondering if anyone had any thoughts on this?


Mark Heller