Heh...

First, one could begin by correctly spelling "business"... Geesh... [Linked Image]


Best I could do in emulating an invoice...

They really look much neater than this:


Materials Used
Quantity Catalogue # Description Cost Each Price Each Amount
15 3-M1700-TEMFLEX Tape Vinyl Electrical Black 0.0115 $0.01 $0.15
3 BLKADR2 Split Bolt #2 AL-Cu 2.3800 $2.38 $7.14
6 BLKECS2 Cable Strap #2 SEU 0.2960 $0.30 $1.80
1 BLKSEC2 Entrance Cap Weather Head #2 SEU 11.8770 $11.88 $11.88
1 BLKWT4 Connector 1-1/4" SEU Weather-Tite 4.7360 $4.74 $4.74
1 BURPENA-1/2 Penentrox Oxygen Inhibitor 0.9936 $0.99 $0.99
4 FASTENER Lag Bolts 1/4" x 1-1/2" 0.2500 $0.25 $1.00
2 NEEC-1251-R Connector 1-1/4" SEU 1.1050 $1.11 $2.22
9 SCRHHD10X1-1/2 Screw Hex #10 x 1-1/2" 0.0418 $0.04 $0.36
2 S-CWA164 Reducing Washer 2" to 1-14" 0.9350 $0.94 $1.88
1 SQD-QOM100VH Circuit Breaker Main 100A 120/240V 79.990 $79.99 $79.99
20 WALSEU2/3AL #2-3 SEU Service Entrance Cable 1.053 $1.05 $21.00
Subtotal $133.15
Sales Tax 6% $7.99
Total Materials $141.14
Labor
Time In Time Out Hours Date Rate Total
18:30 19:30 1.00 3/6/05 $25.00 $25.00
11:40 12:15 0.58 3/7/05 $25.00 $14.58
13:35 15:05 1.50 3/7/05 $25.00 $37.50
9:30 12:00 2.50 3/8/05 $25.00 $62.50
Total Labor 5.58 Man-hours $139.58

Total Amount Due $280.72

Overhead and Breakdown:
2 bounced checks ($60.00) Total Bounced Checks
3 Trips to BGE @ 75 min ($22.50) Total fuel costs
& $7.50 fuel 3.75 hours not billed
9.33 Total Time
$57.08 Money Left for Labor
$6.12 Average hourly wage



[This message has been edited by sparky66wv (edited 03-13-2005).]


-Virgil
Residential/Commercial Inspector
5 Star Inspections
Member IAEI